AL-GABAL AL-ASFAR WASTEWATER TREATMENT PLANT

Al-Gabal Al-Asfar Wastewater Treatment Plant is capable of cleansing 1.7 million cubic meters of wastewater daily. Located at the northeast border of Cairo, Egypt.

The plant conducts primary and secondary treatment of water, removes grit and uses sedimentation, aeration, final settling and clarification andchlorination techniques to purify water completely to treat wastewater effectively

.treated effluent from this plant is used to plant olive, jojoba and flowers in a 40 Acre stretch of landadjoined to it.

The current project aims at enhancing the performance of infrastructure utilities at site to maintainproper operation.

OBOUR STEEL FACTORY

Steel factory at the industrial area of Obour City, the steel fabrication process includes (Forming mill – ENF beveling – Hydro test – coating), the factory consists of:
• Administrative building 594.6 m2.
• Security building 16.275 m2.
• Electric transformer (2), (1) rooms 122 m2.
• Factory hangar 37183 m2.
• Staff break building.

• Pump house.
• Electric Generator.
• Electric panels Building 187 m2.
• Loading Area.

CONSTRUCTION OF THE TAHYA MISR DIALYSIS CENTER

The project Consists of a 3 elements:
• Dialysis centre building with area 1400 m2 (with 40 chairs, water tank, fence, guard room and main gate).
• Medical gas chamber building.
• Electrical equipment room.