Skip to content

AL-SHEROUK PUMP STATION NO.3

AL-SHEROUK CITY, EGYPT
Shop drawing

Client:

Al-Nasr for Buildings and Construction (EGYCO)
Budget:
---
Contracting date:
April 2020
Status:
In Progress

OUR ROLE:

Contractor’s Consultant

Project description:

Rehabilitation of pumping station No.3 in Shorouk City including:
• A new set of pumps with corresponding pipes.
• Construction of a new valve room complete with valves, special pieces and Water hammer tank.
• Electric transformers.
• Electric switchgear 22 KV.
• Control panel.

Hydro scope:

Preparing the work shop drawings of the:
• Electrical works.
• Light current.
• MEP works.