El-Mahismah Pump Station (2) ( 4000 L/sec. or 345,600 m3/day )
Water, Sewage & Irrigation Pumping Stations – El Galala Urban City
Sewage Pumping Stations (PS 38 – 01* capacity 76,464 m³/day) – Industrial Zone
Sewage Pumping Stations (PS1 43,200 m³/day and PS2 17,280 m³/day) – Industrial Zone
Relocation of Borg El Arab Water Station Intake from Mariout Canal (Km 40) to Nubaria Canal (Km 83.7)
New Cairo Sewage Pumping Station & The force main pipe from the Pump Station to Sewage Network
Water Transmission Lines on The Galala Plateau, Strategic Reservoir and Pump Stations
Hayah Karima Initiatives “20 Pumpstations” Markaz Damanhur
1200 mm Water Transmission line from the East Port Said Desalination Plant to the Pump Station 150,000 m3/day
Irrigation Water Pumpstation of Capacity 500 000 m3/day at KM 160.90 of River Nile