Northern Military Zone Command – Engineering Authority
Client’s Consultant
Northern Military Zone Command – Engineering Authority
EGP 2 billion
Beheira – Egypt
August 2022
Survey Work, Geotechnical Investigation report, complete design package and supervision for all disciplines for the following:
The gravity network is composed of pipes with diameters ranging from 200 mm to 1200 mm, covering a total length of approximately 230 km.
The force mains have diameters ranging from 200 mm to 1000 mm, with a total length of approximately 67 km.
A total of 20 pump stations, with the following details:
| No | Total Discharge Capacity | Head (m) | No | Total Discharge Capacity | Head (m) | No | Total Discharge Capacity | Head (m) |
| 1 | 104 L/sec or 8985 m3/day | 10 | 8 | 35 L/sec or 3024 m3/day | 10 | 15 | 60 L/sec or 5184 m3/day | 10 |
| 2 | 36 L/sec or 3110 m3/day | 8 | 9 | 780 L/sec or 67392 m3/day | 12 | 16 | 100 L/sec or 8640 m3/day | 10 |
| 3 | 110 L/sec or 9504 m3/day
|
10 | 10 | 410 L/sec or 35424 m3/day | 11 | 17 | 50 L/sec or 4320 m3/day | 10 |
| 4 | 35 L/sec or 3024 m3/day | 9 | 11 | 675 L/sec or 58320 m3/day | 12 | 18 | 100 L/sec or 8640 m3/day | 9 |
| 5 | 110 L/sec or 9504 m3/day
|
10 | 12 | 100 L/sec or 8640 m3/day | 10 | 19 | 280 L/sec or 24192 m3/day | 12 |
| 6 | 260 L/sec or 22464 m3/day | 11 | 13 | 270 L/sec or 23328 m3/day | 10 | 20 | 200 L/sec or 17280 m3/day | 11 |
| 7 | 220 L/sec or 19008 m3/day | 11 | 14 | 424 L/sec or 36633 m3/day | 11 |
The Pump Stations Components are :
| ·Fence and site utilities | ·Fuel tank base | ·Generator building |
| ·Flow measurement | ·Pump house | ·Transformer building |
| ·Valve room | ·Security building | ·Administrative building |
| ·Surge tank and surge tank base | ·Distribution building | ·Storage and workshop buildings |
Concept, Detailed Design
Tender Documents
Construction Supervision