Water Department – Engineering Authority
Client’s Consultant
Water Department – Engineering Authority
EGP 2.2 billion
150,000 m3/day
East Port Said - Egypt
March 2021 & January 2022
A complete design package covering all disciplines for the project, including the design and supervision of:
Summary of the pumping station:
| Component | Specification | Component | Specification |
| Pumping Station Capacity | 150,000 m³/day | Head (Vertical Lift) | 60 meters |
| Number of Pumps | 5 pumps | Water Tanks | 6 tanks (GLS) |
| Flow per Pump | 290 L/s | Capacity per Tank | 25,000 m³/day per tank |
| Total Flow Rate
(for 5 pumps) |
1,450 L/s or 125,400 m³/day | Total Tank Storage Capacity | 150,000 m³/day |
Concept, Detailed Design and Tender Documents