Sewage Pumping Stations (PS1 43,200 m³/day and PS2 17,280 m³/day) – Industrial Zone

Client

The Suez Canal Economic Zone

Our Role

Contractor’s Consultant

Contractor

Hassan Allam for Construction

Budget

EGP 350 million

Capacity

PS1 43,200 m³/day and PS2 17,280 m³/day

Location

East Port Said - Egypt

Project Date

April 2020

Project Description

  • The East Port Said Sewage Pump Station is an essential / key infrastructure component within the Suez Canal Economic Zone (SCZone) in Egypt. Located in this strategically important industrial and logistics hub.
  • The SCZone, which is positioned along the northern entrance of the Suez Canal, is designed to support industrial, commercial, and residential growth, and the sewage pump station is a key element in maintaining the area’s environmental and operational sustainability.

Scope of Work

Preparation of detailed design, shop drawings, take-off, BOQ and as-built drawings for the architectural, structural, electromechanical, and network, as well as site work, for two pump stations:

  • Pump Station 1 has a capacity of 500 liters/second (43,200 m³/day), H = 54 meter.
  • Pump Station 2 has a capacity of 200 liters/second (17,280 m³/day), H= 29 meter.

Both stations are equipped with similar components, including a pump station building, substation, RMU (Ring Main Unit), guard room, water hammer protection system, valve chamber, odor control system, and flow meter chamber.

Hydro Services

Detailed Design

Shop Drawings

As-built Drawings

Project Gallery

Project Video

Company Brochure

Explore the complete Hydro company profile,
capabilities, and selected projects.

Related Projects

Submit Your CV