WEST AL-SHEROUK HOUSING PROJECT
HAYAH KARIMA – BEHIRA
FARMING 3000 FEDDANS OF FORESTRY
TAHYA MISR PROJECT – ASWAN
The project includes various activities where the consultant task was to supervise a variety of works including water and sewerage networks and treatment works, supervision the construction of public service components as the Dialysis Hospital, industrial zones infrastructure in Genina and Shebbak areas, etc.
NASR GARDENS HOUSING PROJECT
BEIT AL-WATAN UTILITIES & LAND SETTLEMENT
As per the Egyptian government initiative to keep expatriates seeking job opportunities and/or immigration, it presented Bait Al-Watan project that goes along with the plan through New Cairo City, the project started with 1200 acres. The project consists of:
• 3,500,000 cubic meters of excavation and 4,000,000 cubic meters of filling for roads work as the total area of the roads is 110 km.
• Potable water network ranging from 100 mm up to 600 mm with a total length of 75 km.
• Irrigation network which ranges from 50 mm up to 160 mm.
• Sewer network which ranges from 200 mm up to 800 mm with total length 70 km.
• Water and irrigation valve chambers and firefighting taps.
• Internal road networks.
• Settlement work for land plots.
NEW ADMINISTRATIVE CAPITAL AIRPORT UTILITIES
New Administrative Capital International Airport which is located in the area of Katameya – New Cairo, will be dedicated to serve New Cairo, Cairo Capital, Port Said, Ismailiya and Suez. The new airport serves Cairo’s growing number of international travelers and reduces the pressure on Cairo International Airport.
SHARM AL-SHEIKH RESORT
The resort is located in one of the most recognized areas of Sharm Al-Sheikh City and is considered one of important resorts which is characterized by its luxury, beautiful beaches, lagoons and landscapes.
The road network of the resort will be designed to serve the villas and apartments and match with the distinctive landscape provided.
PROJECT 110 UTILITIES
The project consists of:
• Main drainage network with total length of about 87 km.
• Main irrigation network with total length of about 85 km.
• Sub-networks (drainage, water, irrigation and roads).
• (13) pumping stations.
• (18) storage ground water, irrigation and fire tanks.
• One main irrigation lift.
• Force main lines from the project to the treatment plant.
• Irrigation transmission line diameter 1000 mm from the treatment plant to the main irrigation crane project.