BEIT AL-WATAN UTILITIES & LAND SETTLEMENT
Client:
OUR ROLE:
Project description:
As per the Egyptian government initiative to keep expatriates seeking job opportunities and/or immigration, it presented Bait Al-Watan project that goes along with the plan through New Cairo City, the project started with 1200 acres. The project consists of:
• 3,500,000 cubic meters of excavation and 4,000,000 cubic meters of filling for roads work as the total area of the roads is 110 km.
• Potable water network ranging from 100 mm up to 600 mm with a total length of 75 km.
• Irrigation network which ranges from 50 mm up to 160 mm.
• Sewer network which ranges from 200 mm up to 800 mm with total length 70 km.
• Water and irrigation valve chambers and firefighting taps.
• Internal road networks.
• Settlement work for land plots.
Hydro scope:
Preparing workshop drawings for all utilities and roads in addition to performing all the field work
survey, soil investigation and calculating the cut and fill volumes.