Phase 1 – New Capital Wastewater Treatment Plant Capacity 250,000 m3/day

Client

Holding Company for Water and Wastewater (HCWW)

Our Role

Contractor ‘s Consultant

Contractor

Hassan Allam Construction

Budget

EGP 12 billion

Capacity

250,000 m3/day

Location

New Administration Capital - Egypt

Project Date

October 2018

Project Description

  • The New Administrative Capital of Egypt aims to drive sustainable development and positively impact the economy. The targeted project involves a tertiary wastewater treatment plant with a capacity to treat 250,000 m³/day of wastewater for reuse in irrigation using ASBR system followed by tertiary treatment. It includes the plant, auxiliary buildings, an inlet pump station, networks, roads, and a 100,000 m³ irrigation tank. Civil guide drawings have been provided by the general process contractor, and  Hydro team will proceed according to the outlined scope.

Scope of Work

The design package covers civil works, electrical works, and HVAC for both process and non-process buildings, including:

  • Water, drainage, firefighting, storm, irrigation, and electrical networks.
  • Specifications for civil works in process buildings, along with complete specifications for non-process buildings and all project components.

Plant components include:

IPS Building Crystallization Building Electrical Building
Main Distribution Room Irrigation and Chlorine Injection Tank Store and Workshop Building
Chlorine Building Primary Sedimentation Tanks Sludge Thickening Building
New Administrative Building Fence, Security Room & Mosque Filtration Building
Head Work Building ASBR Tanks Generators and Transformers Building

Hydro Services

  • Detailed Design
  • Shop Drawings
  • As-built