The full design package, tender documents and construction supervision for the gravity pipeline, and associated manholes includes: 1500 mm C.H.D.P.E. pipes, spanning a total length of 2,855 meters. Trenchless installation of reinforced concrete jacking pipes, comprising a jacking shaft with a 7-meter internal diameter and 6-meter depth, and a receiving shaft with a 5-meter internal diameter and 6-meter depth, over a total drive length of 178 meters 18 manholes.
Concept, detailed design and tender documents
Construction Supervision