REHABILITATION OF AL-KATTAMEYA WWTP
Client:
OUR ROLE:
Project description:
The treatment plant with a capacity of 80 thousand m3/day has been established with the active sludge system several years ago, during which it was subjected to phases of operation and discontinuation (outside the scope of the current study). around and inside some basins or units. Therefore, the current project was launched to rehabilitate the treatment lines (up to secondary treatment) at the Kattameya plant, with a capacity of 80,000 m3/day.
Hydro scope:
Rehabilitation of the station by:
• Determine the current status of the station.
• Review the hydraulic design of the existing units.
• Determining the electromechanical equipment and supplies that need to be replaced.
• Studying the extent to which the current basins accommodate to increase disposal.