AL-GABAL AL-ASFAR WWTP, PHASE III PUMP STATION

QALYUBIA, EGYPT
Design

Client:

Construction Authority for Potable water & Wastewater (CAPW)
Budget:
---
Contracting date:
June 2021
Status:
In Progress

OUR ROLE:

Owner’s Consultant

Project description:

Al-Gabal Al-Asfar wastewater treatment plant is considered the most important treatment plant in the east Nile sector, it has the capacity of 3 million cubic meters per day and it is now in the process of constructing a new phase with capacity of 500 thousand cubic meters per day, which would cover the consumption of most areas in the Greater Cairo.
Another project with capacity of 1 million cubic meters and a maximum capacity of 1.3 million cubic meters per day.

Hydro scope:

Prepare design drawings and the tender documents for the pump station of Al-Gabal Al-Asfar third phase. All connections on the existing chambers, drain and the connection with the future phase of the project.