AL-NUBARIA CONDUIT WATER INTAKE TO THE WATER TREATMENT PLANT

BORG AL-ARAB – AL-NUBARIA, EGYPT
Shop drawing

Client:

Concord for Engineering & Contracting
Budget:
---
Contracting date:
February 2016
Status:
Delivered

OUR ROLE:

Contractor’s Consultant

Project description:

Within Country’s plan to develop infrastructure and utilities across all governorates to keep up with the fast growth of population and to enhance the potable water services across the country; Borg Al-Arab project was started to design a water intake, transmission lines and water treatment plant for Al-Nubaria conduit water.

Hydro scope:

• Prepare workshop drawings for the water intake on “Al-Nubaria” conduit.
• Prepare workshop drawings for the transmission lines 15 Km long from the water intake to the water treatment plant.
• Prepare the workshop drawings for the pump station.
All the above drawings are produced including all the special parts, levels, chambers and cross-sections. All works are done according to the specifications and the Egyptian code of practice.