The Current and Future Integrated Sewage System for The New City of Borg El Arab City

Client

New Urban Communities Authority (NUCA)

Our Role

Client’s Consultant

Client

New Urban Communities Authority (NUCA)

Budget

EGP 2.6 billion

Capacity

Location

Alexandria, Egypt

Project Date

August 2023

Project Description

The Integrated Sewage System for Borg El Arab City, Alexandria, Egypt, is a key infrastructure project aimed at improving wastewater management in the rapidly growing city. The current system is limited, with many areas relying on basic septic tanks. The future system will expand the sewage network, upgrade treatment plants, and incorporate water reuse for irrigation and industrial use. This project will enhance public health, reduce environmental pollution, and promote sustainable water management, supporting the city’s development and long-term sustainability.

Scope of Work

Survey work, concept, detailed and design tender documents of the following tasks:

  • Develop a general layout for the new sewage network, pumping stations, and treatment plants in Borg El Arab, ensuring integration with the existing infrastructure, while reviewing and assessing both existing and new treatment plants to determine their combined capacity and performance, and connecting all components via a SCADA system.
  • Evaluate the current performance of the Phase 1 aerated oxidation ponds and analyze various operational scenarios.
  • Identify necessary operational adjustments to reduce suspended solids and COD levels exceeding discharge limits.
  • Assess the overall capacity of the integrated existing sewage system.
  • Design of Force main: diam. 560 mm and L= 1726 meter

Hydro Services

Concept and Detailed Design

Tender Documents.

Project Gallery

Project Video

Company Brochure

Explore the complete Hydro company profile,
capabilities, and selected projects.

Related Projects

Submit Your CV