New Cairo Water Treatment Plant 3rd phase, capacity 500,000 m³/ day

Client

Construction Authority for Potable Water and Wastewater

Our Role

Client’s Consultant

Client

Construction Authority for Potable Water and Wastewater

Budget

EGP 10 billion

Capacity

500,000 m³/ day

Location

Cairo Governorate - Egypt

Project Date

December 2025

Project Description

The project aims to design the third phase of the drinking water treatment plant in New Cairo, with a daily production capacity of 500,000 m³, bringing the total treated water capacity to 1,500,000 m³/day. The treatment technology is based on Super Pulsators for sedimentation and rapid sand filtration. Sludge will be handled using gravity thickeners and drying beds, while lamella settlers are used for the concentration of filter backwash water. The study includes an Environmental Impact Assessment (EIA). The third phase includes a detailed design for all associated works and systems with a capacity of 500,000 m³/day. In parallel, a master plan layout shall be developed for both the third and fourth phases, each with a capacity of 500,000 m³/day

Scope of Work

  • Topographic survey, soil investigation and hydraulic calculations.
  •  

    Environmental Impact Assessment Study.

  • Complete design package for the strategic tank capacity and the treatment plant for all disciplines (Process, Arch, Structure, Electrical, Mechanical, Plumbing, HVAC) for the below units in addition to the non- process buildings  :

    Substation Building and Fuel Tank

    Chlorine Building Supernatant Pump Station

    Alum Storage Tank ( 50 tons )

    Gravity Sludge Pumps

    Gravity Thickeners

    Rapid Sand Filters Pulsators

    Mechanical Dewatering

Hydro Services

  • Concept and Detailed Design
  • Tender Documents