The Suez Canal Economic Zone
Contractor’s Consultant
El Gosoor
EGP 750 million
76,464 m³/day
East Port Said - Egypt
May 2022
Review and approve the detailed design, shop drawings, quantity take-off (QTO), Bill of Quantities (BOQ), and as-built drawings for the architectural, structural, electromechanical, pipeline network, and site works of Pump Station 38-01*. The pumping station is designed for a total capacity of 885 L/s (76,464 m³/day) at a Total Dynamic Head (TDH) of 34 m and is equipped with ten (10) sewage pumps (8 Duty + 2 Standby).The scope includes review of the pump station building, electrical substation, RMU, guard room, water hammer protection system, valve chambers, odor control system, flow meter chamber, two (2) discharge pipelines (Ø1200 mm), fire-fighting networks, site cable routes, external lighting poles, landscaping works, roads, and all associated mechanical, electrical, instrumentation, control, and external infrastructure works.
Design Review
Shop Drawings
As-built Drawings
Explore the complete Hydro company profile,
capabilities, and selected projects.
All Rights Reserved © Designed by Hydro