Fire Protection Network for the General Site of the Camp in Robeiky

Client

Military Works Department-Engineering Authority

Our Role

Client’s Consultant

Main Consultant

Military Works Department-Engineering Authority

Budget

EGP 50 million

Capacity

86 Feddans

Location

Cairo - Egypt

Project Date

March 2021

Project Description

The project is an industrial complex divided into manufacturing units with various simple industrial engineering and chemical industries, as well as service facilities for factories and employees.

Scope of Work

Fire Protection Network Design and Supervision for an area of 880,801 m² Water Firefighting System: Powered by the existing fire pump network (1300 gallons/min at 6 bar), including fire pipes, sprinklers, and 14 double-type fire hose boxes (1-inch and 2.5-inch hoses)

Gas-based Fire Suppression: Total flooding aerosol gas system with integrated sensors and alarms

Automatic Sprinklers: Activated at 68°C, installed in administrative areas, warehouses, and areas with ceilings over 80 cm

Fire Valves: UL/FM certified, designed for 20 bar pressure, made of ductile iron

Manual Fire Extinguishers: CO2 (6 kg) and ABC powder (6 kg) extinguishers strategically placed throughout the factory

Fire Alarm System: Addressable system with heat and smoke detectors, including beam sensors for high-ceiling areas

Electrical Systems: Designed to meet the building’s electrical capacity

Escape Routes and Signage: Fire-resistant doors, wide escape routes, and clear emergency exit signage

Ventilation: Fire-resistant fans for effective smoke extraction

Emergency Lighting: Automatically activated during fire or power failure

Hydro Services

Concept and Detailed Design

Construction Supervision

Project Gallery

Project Video

Company Brochure

Explore the complete Hydro company profile,
capabilities, and selected projects.

Related Projects

Submit Your CV