Water Management - Engineering Authority
Client’s Consultant
Water Management - Engineering Authority
EGP 64 billion
10 million m³
Northwestern Part of Egypt
August 2022 and April 2023
Preparing a comprehensive design package covering all disciplines for the project.
250-meter pipe jacking crossing under the Cairo-Alexandria Desert Road, with jacking pits (9.25m x 63.5m x 9.95m and 9.25m x 14.5m x 9.95m) and receiving pits (9.20m x 63.5m x 9.17m and 9.20m x 14.5m x 9.17m), containing 11 steel pipes (2500 mm diameter) within concrete sleeves (3200 mm diameter). B. 200-meter pipe jacking under the Sumed pipeline, with jacking pits (23m diameter, 11.14m depth x 3 and 18.5m diameter, 11.14m depth x 1) and receiving pits (22m diameter, 11.73m depth x 3 and 18m diameter, 11.73m depth x 1), containing 11 steel pipes (2200 mm diameter) within concrete sleeves (3400 mm diameter).C.A 90-meter open-cut crossing under the Birkash Road, with a jacking pit (4.6m x 67.5m x 6.9m) and a receiving pit (5.35m x 67.5m x 8.25m), containing 11 steel pipes (2200 mm diameter) within concrete sleeves (3200 mm diameter). D. 200-meter open-cut crossing under the Dabaa Road, with a jacking pit (9.25m x 46m x 7.40m) and a receiving pit (8.8m x 46m x 9.27m), containing 11 steel pipes (2200 mm diameter) enclosed in concrete sleeves (3700 mm diameter).
Explore the complete Hydro company profile,
capabilities, and selected projects.
All Rights Reserved © Designed by Hydro