The Expansion of Matay Water Treatment Plant Capacity 34 000 m3/day

Client

Holding Company for Water and Wastewater (HCWW)

Our Role

Contractor’s Consultant

Contractor

Concord for Engineering and Contracting

Budget

EGP 500 million

Capacity

34 000 m3/day

Location

Minya Governorate - Egypt

Project Date

May 2020

Project Description

  • This project involves an expansion phase that will increase the capacity from 34,000 to 68,000 cubic meters per day treated water using Chemical Sedimentation followed by Filtration and Disinfection. This enhancement aims to better meet the city’s drinking water demands, contributing to the ongoing efforts to improve infrastructure and the quality of drinking water services for residents. The Water Treatment Plant (WTP) will provide clean, potable water to the entire city of Matay.

Scope of Work

  • Prepare design drawings for civil works based on the electromechanical process provided by the contractor “IETOS,” and deliver a complete design package for non-process buildings and infrastructure utilities.
  • Plant Components are:
·Rapid Mixing Tank ·Concentrated Sludge Lift Pumps ·Chemicals Building
·Flocculant and Coagulation Building ·Filter Wash and Clarification Waste Lift and Storage Pumps ·Generation Building & Transformer Building
·Rapid Sand Filter Building ·Drying Beds ·Sludge Thickening Tanks
·Ground Storage Tank ·Chlorine Injection Cylinders and Equipment Building ·Admin. Building & Guard Room

Hydro Services

  • Concept and Detailed Design
  • Shop drawings
  • As-built drawings