The New Sphinx City Authority
Client’s Consultant
The New Sphinx City Authority
EGP 9 Billion
Giza - Egypt
July 2026
The scope of work comprises the complete engineering design package for the New Sphinx Sewage Pumping Station, including the inlet chamber, mechanical screening facilities, wet well, pump sump, centrifugal pumps, valve chamber, surge protection system, odor control and ventilation systems, electrical and control buildings, standby power supply, SCADA and instrumentation systems, together with the 15 km, DN1500 wastewater force main, the connection chamber integrating flows from New Sphinx, Jiryan, and Zayed City, and the approximately 19 km large-diameter gravity wastewater transmission line conveying the combined flows to the 6th of October Wastewater Treatment Plant (WWTP).
The engineering package includes all hydraulic, civil, structural, mechanical, electrical, instrumentation and control (I&C), and architectural designs, as well as design calculations, technical specifications, construction drawings, bills of quantities, cost estimates, and tender documents, providing a complete and integrated solution for a reliable and sustainable wastewater transmission system.
| Fence and site utilities | Fuel tank base | Generator building |
| Flow measurement | Pump house | Transformer building |
| Valve room | Security building | Administrative building |
| Surge tank and surge tank base | Distribution building | Storage and workshop buildings |
Concept and Detailed Design
Construction Supervision
Explore the complete Hydro company profile,
capabilities, and selected projects.
All Rights Reserved © Designed by Hydro