Moshir Corridor Sewage PS

North and South Moshir Corridor, Greater Cairo, Egypt

October 2021 and May 2023

Client

Sanitary Drainage Authority for Greater Cairo

Budget

EGP 4.3 billion

Capacity

443,059 m³/day

Network Length

Project Overview

Survey, geotechnical report, complete design package, concept/detailed design and tender documents for networks, force mains and pump stations.

Scope of Work

Survey, geotechnical report, complete design package, concept/detailed design and tender documents for networks, force mains and pump stations.

Technical Highlights

443,059 m³/day

Capacity

Network Length

EGP 4.3 billion

Budget

October 2021 and May 2023

Date