Matay WTP Expansion

Matay City, Egypt

May 2020

Client

Holding Company for Water and Wastewater (HCWW)

Budget

EGP 500 million

Capacity

34,000 to 68,000 m³/day

Network Length

Project Overview

Concept and detailed design, shop drawings and as-built drawings for civil works, non-process buildings and infrastructure utilities.

Scope of Work

Concept and detailed design, shop drawings and as-built drawings for civil works, non-process buildings and infrastructure utilities.

Technical Highlights

34,000 to 68,000 m³/day

Capacity

Network Length

EGP 500 million

Budget

May 2020

Date

Project Gallery

Related Projects

Egypt
PS1 500 L/s; PS2 200 L/s
Egypt
4,500 m³ stormwater tank; 34 secured LV chambers
Egypt
40,000/70,000 m³/day; 35 feddans