Infrastructure Work of Up Town Project -Administrative Control Authority Land

Client

6th of October City Authority

Our Role

Client’s Consultant

Main Consultant

6th of October City Authority

Budget

EGP 980 million

Land Area

3,482 feddans

Location

6th of October City, Egypt

Project Date

May 2020

Project Description

6th of October City is a modern urban development located near Cairo, aimed at supporting residential and commercial growth. Our project in Zone Y1, covering 3,482 feddans, is a pivotal area within the city. It focuses on the development of essential infrastructure, including water supply, sewage systems, irrigation, firefighting services, and road construction

Scope of Work

Design and Supervision of:

Sewage Network (Drainage and Storm): UPVC pipes (160, 200,250, and 315 mm), L = 370 km, concrete pipes (800 to 1600 mm), L= 9180 linear meters and vitrified clay pipes (300 to 600 mm) with a total length of 23444 linear meters, including 145 rectangular sewage manholes, 6126 circular sewage manholes, and 2050 stormwater manholes.

Irrigation Network: HDPE irrigation pipes (100 mm to 250 mm) with a total length of 112 km .

Water Network: UPVC pipes (110 mm to 600 mm) with a total length of 350 km, along with 35 valve chambers of various prototypes.

Firefighting: 625 ductile iron fire hose connections (2.5 inches, with 2 openings).

Roads: L= 2076 meters.

Hydro Services

Conceptual design and detailed design

Tender documents

Construction Supervision

Project Gallery

Project Video

Company Brochure

Explore the complete Hydro company profile,
capabilities, and selected projects.

Related Projects

Submit Your CV