Infrastructure Work for Road Link 1 Surrounding the La Vista Residential District

Client

New Urban Communities Authority (NUCA)

Our Role

Client Consultant

Client

New Urban Communities Authority (NUCA)

Budget

EGP 144 million

Capacity

Location

New Administrative Capital - Egypt.

Project Date

December 2023

Project Description

The supervision of the utility infrastructure works includes overseeing the installation of utility pipelines (UPVC and HDPE) for stormwater, sewage, irrigation, and water supply systems, stormwater catch basins, sewage manholes, and the role involves ensuring adherence to design specifications, coordinating with contractors, inspecting quality and materials, and monitoring progress. Additionally, the supervisor manages safety, budget, and scheduling to ensure the successful and timely completion of the infrastructure, supporting the development of the New Administrative Capital.

Scope of Work

Supervision of:

Sewage and Stormwater Network: UPVC stormwater pipes with a 160 mm diameter, UPVC sewage pipes ranging from 225 mm to 560 mm in diameter, and HDPE sewage pipes with a 630 mm diameter, with a total length of 12,900 meters for the sewage network.

Water Network: HDPE pipes with diameters of 500 mm and 800 mm, totaling 2,000 linear meters.

Irrigation Network: HDPE pipes with diameters ranging from 110 mm to 500 mm, covering 11,275 linear meters.

Stormwater Catch Basins and Sewage Manholes: 205 stormwater catch basins and 204 sewage manholes.

Hydro Services

Project Gallery

Project Video

Company Brochure

Explore the complete Hydro company profile,
capabilities, and selected projects.

Related Projects

Submit Your CV