New Urban Communities Authority (NUCA)
Client’s Consultant
New Urban Communities Authority (NUCA)
EGP 300 million
86 Feddans
El Sheikh Zayed -Egypt
March 2024
The comprehensive design package for all disciplines and the preparation of tender documents covers a variety of engineering tasks, ensuring adherence to approved technical standards and specifications for the successful delivery of the project.
These tasks include:
Sewage Network: Pipe diameters ranging from 200 mm to 315 mm, with a total length of 4,480 meters.
Water and Irrigation Supply Network: Pipe diameters ranging from 100 mm to 200 mm, with a total length of 7,575 meters.
Road Network Design: Total length of 9.5 km.
Conceptual design and detailed design
Tender documents
Explore the complete Hydro company profile,
capabilities, and selected projects.
All Rights Reserved © Designed by Hydro