Manshaeet El Kiram Wastewater Treatment Plant 10,000 / 20,000 m3/day

Client

Construction Authority for Potable Water and Wastewater

Our Role

Client’s Consultant

Client

Construction Authority for Potable Water and Wastewater

Budget

EGP 400 million

Capacity

10,000 / 20,000 m3/day

Location

El Qalubiya - Egypt

Project Date

February 2018

Project Description

  • The wastewater treatment plant in Manshat Al-Karam, Shibin Al-Qanater, is a vital project under Egypt’s “Hayah Karima” initiative, aimed at improving rural infrastructure. Initially designed with a capacity of 10,000 cubic meters per day, the plant’s future capacity will increase to 20,000 cubic meters daily to meet growing demands using ASBR System. The facility will serve 24 villages, receiving and treating raw sewage to ensure safe water discharge into the Belbeis drain

Scope of Work

The Design review and Supervision tasks include:

  • Review design and supervision of all plant units. Evaluate test results and review surveying works. Assist the client in handing over site dimensions, boundaries, and levels to the contractor. Review contractor schedules and execution methods, ensuring quality control adherence. Review civil works requirements and material sourcing. Perform cost analysis and manage the bill of quantities. Analyze payment certificates and resolve contractual issues. Monitor commissioning tests. Contribute to the creation of as-built documentation. Participate in both initial and final project handovers.
  • Plant Units:
·Inlet building and screening ·Workshop and warehouse ·Aeration tanks
·Mechanical dewatering ·Administration building ·Chlorine contact tank
·Electrical room ·Chlorine House ·Filter control panel building
·Control room ·Pump room ·Guard House & Fence

Hydro Services

  • Design Review
  • Construction Supervision.