Ministry of Water Resources and Irrigation
Contractor’s Consultant
The National Company
EGP 2.7 billion
75,000 Feddans
Aswan Governorate - Egypt
December 2024
*Design Review – Review of detailed designs, shop drawings, calculations, method statements, and technical submittals.
*Construction Supervision – Supervision of the 57 km main canal and 9.6 km secondary canal, including excavation, earthworks, grading, canal formation, and finishing works.
*Hydraulic Structures – Supervision of 3 culverts, 18 intakes, 1 bridge, 2 pumping stations ( 3 million m3/day , Force main L= 180 , dia. 1800mm and 2 million m3/day, Force main L = 170 , dia. 1600mm ), 1 regulator, 1 secondary-canal intake, and 9 weirs.
*Quality Control – Inspection and approval of materials, workmanship, testing, and compliance with project specifications.
*Progress Monitoring – Monitoring the Contractor’s progress, construction program, schedules, and site activities.
*Contract Administration – Measurement and verification of works, review of payment applications, variations, claims, and contractual matters.
*Technical Coordination – Coordination among the Owner, Contractor, Consultant, and relevant authorities, including resolution of technical issues.
*Testing & Commissioning – Supervision of testing, commissioning, completion, snagging, handover, and as-built documentation.