Hydrological Study of the 27 km Tunnel- Ayoun Moussa Road

Client

Ministry of Transport -General Authority for Roads Bridges and Land Transport

Our Role

Contractor’s Consultant

Contractor

International Consulting Engineers

Budget

EGP 190 million

Project Scale

27 km

Location

Ayoun Moussa, Egypt

Project Date

February 2015

Project Description

A hydrological and protection study for the 27 km Tunnel–Ayoun Moussa Road, addressing the technical and environmental factors that influence the road’s design, construction, and safe operation.

Scope of Work

The development of the 27 km Tunnel-Ayoun Moussa road involves a comprehensive series of studies and protection works to ensure the project’s success and sustainability. These studies focus on various aspects that will influence the design, construction, and long-term functionality of the road.

The key components of these studies and protection works are:

 

  • Morphological studies
  •  Topographical studies
  •  Geological studies
  •  Meteorological studies
  •  Hydrological studies
  •  Hydraulic studies
  • Protection works

Hydro Services

  • Studies