Barqash–Sheikh Zayed Pipeline

Client

New Urban Communities Authority

Our Role

Client’s Consultant

Client

New Urban Communities Authority

Budget

EGP 600 million

Pipeline Length

5 km

Location

Giza - Egypt

Project Date

September 2023

Project Description

A 5 km steel water transmission pipeline connecting the intake structure to the booster pumping station in Barqash City, designed to improve the reliability of water supply to the Sheikh Zayed Water Treatment Plant.

Scope of Work

Survey work and complete design package for:

 

  • A 5 km steel water transmission pipeline.
  •  Pipeline diameter of 2200 mm.
  •  Connection chambers.
  •  Air valve chambers.
  •  All required pipeline components.
  •  Ductile cast iron valves and fittings.
  •  PN16 valves and fittings designed to withstand high pressure.
  •  Study of the proposed steel force main replacing the existing GRP pipelines.
  • Coordination with the intake structure and booster pumping station.

Hydro Services

  • Concept Design
  •  Detailed Design
  •  Tender Documents
  •  Construction Supervision