Baladrooz WTP

Client

Ministry of Construction and Public Municipalities - General Directorate for Water

Our Role

Sub-consultant to the Main Consultant

Sub-consultant

To the Main Consultant

Budget

US Dollars 44 Million

Capacity

44,000 m³/day

Location

Diyala Governorate - Iraq

Project Date

July 2025

Project Description

A potable water treatment project with a nominal production capacity of 2,000 m³/h, including a new intake from El Rooz Canal, two booster stations and associated transmission and distribution pipelines.

Scope of Work

A potable water treatment project with a nominal production capacity of 2,000 m³/h, including a new intake from El Rooz Canal, two booster stations and associated transmission and distribution pipelines.
Scope of Work:

 

  • Detailed design review of a 2,000 m³/h Water Treatment Plant.
  •  Detailed design review of two booster stations.
  •  Review of the associated transmission and distribution pipelines.
  •  Verification of the hydraulic and structural design of the intake structure from El Rooz Canal.
  •  Review of treatment processes, hydraulic profile, mechanical and electrical systems, chemical dosing and storage tanks.
  •  Review of the Baladrooz and Imam Asker booster stations.
  •  Review of pump selection, hydraulic head, surge protection, layouts and MEP systems.
  •  Review of HDPE PN10 pipelines delivering flows between 42 and 444 L/s.
  •  Pipeline diameters ranging from 250 to 800 mm.
  •  Verification of pipeline lengths, hydraulic calculations, connections and valve arrangements.
  •  Review of electrical supply, automation, instrumentation, control and SCADA systems.
  •  Review of buildings, foundations, supports and site layouts.
  • Verification that drawings, BOQs and designs comply with the project specifications.

Hydro Services

  • Detailed Design Review
  • Tender Documents