East Port Said Sewage PS

East Port Said, Egypt

April 2020

Client

The Suez Canal Economic Zone

Budget

EGP 350 million

Capacity

PS1 500 L/s; PS2 200 L/s

Network Length

Project Overview

Detailed design, shop drawings and as-built drawings for two pump stations and site components.

Scope of Work

Detailed design, shop drawings and as-built drawings for two pump stations and site components.

Technical Highlights

PS1 500 L/s; PS2 200 L/s

Capacity

Network Length

EGP 350 million

Budget

April 2020

Date

Project Gallery

Related Projects

500,000 m³/day
Egypt
800,000 m³/day
Egypt
500,000 m³/day