Al Galala Booster Stations

Al Galala City, Egypt

September 2016

Client

Water Department - Engineering Authority

Budget

EGP 1.2 billion

Capacity

150,000 m³/day lifted 542 m; 4 booster stations

Network Length

Project Overview

Complete design package and supervision; concept and detailed design drawings; SCADA integration.

Scope of Work

Complete design package and supervision; concept and detailed design drawings; SCADA integration.

Technical Highlights

150,000 m³/day lifted 542 m; 4 booster stations

Capacity

Network Length

EGP 1.2 billion

Budget

September 2016

Date