New Ismailia Water Pipelines

Ismailia - Egypt

August 2018

Client

Water Department - Engineering Authority

Budget

EGP 160 million

Capacity

900 mm

Network Length

Project Overview

Concept and detailed design; construction supervision; hydraulic design, route planning, materials, pump/control systems, testing and commissioning.

Scope of Work

Concept and detailed design; construction supervision; hydraulic design, route planning, materials, pump/control systems, testing and commissioning.

Technical Highlights

900 mm

Capacity

Network Length

EGP 160 million

Budget

August 2018

Date